ZENEZINI, GIOVANNI

ZENEZINI, GIOVANNI  

Dipartimento di Ingegneria Gestionale e della Produzione  

028739  

Mostra records
Risultati 1 - 20 di 73 (tempo di esecuzione: 0.052 secondi).
Citazione Data di pubblicazione Autori File
A Requirements-Based Extension of Earned Value Management for Engineering Project Control / Ottaviani, F.M., Zenezini, G., Rebuglio, M., Moroni, F., Romagnoli, G., Zammori, F.. - ELETTRONICO. - 813:(2027), pp. 327-342. (45th IFIP WG 5.7 International Conference on Advances in Production Management Systems, APMS 2026 ita 2026) [10.1007/978-3-032-38618-2_22]. 1-gen-2027 Ottaviani F. M.Zenezini G.Rebuglio M. + -
An Exploratory Analysis on the Use of Earned Value Management in Project-Based Italian Organisations / Nicolosi, D.P., Ottaviani, F.M., Romagnoli, G., Zammori, F., Zenezini, G.. - ELETTRONICO. - 813:(2027), pp. 343-357. (45th IFIP WG 5.7 International Conference on Advances in Production Management Systems, APMS 2026 ita 2026) [10.1007/978-3-032-38618-2_23]. 1-gen-2027 Ottaviani F. M.Zenezini G. + -
Design of a Sensorized Safety Helmet for Stress and Cognitive Workload for Automated Warehouses Operators / Olivetti, E.C., Ferrari, A., Mangano, G., Zenezini, G., Vezzetti, E., Rafele, C., Celeghin, A., Moos, S., Marcolin, F.. - (2027), pp. 203-217. (45th IFIP WG 5.7 International Conference on Advances in Production Management Systems, APMS 2026 ) [10.1007/978-3-032-38610-6_14]. 1-gen-2027 Elena Carlotta OlivettiAndrea FerrariGiulio ManganoGiovanni ZeneziniEnrico VezzettiCarlo RafeleSandro MoosFederica Marcolin + -
From Model Assessment to Process Fit: Designing Benchmark Dimensions for LLMs in Business Contexts / Pinto, R., Alfnes, E., Bandinelli, R., Zenezini, G.. - (2027), pp. 626-641. (45th IFIP WG 5.7 International Conference on Advances in Production Management Systems, APMS 2026 ) [10.1007/978-3-032-38614-4_41]. 1-gen-2027 Giovanni Zenezini + -
Large Language Models in Supply Chain Management: A SCOR-Based Assessment of Process Positioning and Implementation Stages / Zenezini, G., Gagliardi, M., Cagliano, A.C.. - 809:(2027), pp. 74-88. (45th IFIP WG 5.7 International Conference on Advances in Production Management Systems, APMS 2026 ita 2026) [10.1007/978-3-032-38602-1_6]. 1-gen-2027 Zenezini G.Cagliano A. C. + -
A Literature Review on the Integration of System Dynamics and Machine Learning/Artificial Intelligence in Addressing Environmental Matters / Nesanır, M.O., Zenezini, G., Senvar, O., Ottaviani, F.M.. - 764:(2026), pp. 370-384. (44th IFIP WG 5.7 International Conference on Advances in Production Management Systems, APMS 2025 Kamakura (JP) 2025) [10.1007/978-3-032-03515-8_26]. 1-gen-2026 Zenezini, GiovanniOttaviani, Filippo Maria + revised_01_splnproc2501 (1).pdf; 978-3-032-03515-8_compressed.pdf
Exploring conditions for economic sustainability of city hubs adoption in urban logistics - a system dynamics approach / Andruetto, C., Zenezini, G., Gillstrom, H., Pernestal, A.. - In: INTERNATIONAL JOURNAL OF SUSTAINABLE TRANSPORTATION. - ISSN 1556-8318. - (2026), pp. 1-22. [10.1080/15568318.2025.2584181] 1-gen-2026 Zenezini G. + Exploring conditions for economic sustainability of city hubs adoption in urban logistics - a system dynamics approach.pdf
Digital Twin Applications for Intralogistics Processes: A Literature Review / Ferrari, A., Mangano, G., Zenezini, G.. - In: IFAC PAPERSONLINE. - ISSN 2405-8971. - 59:(2025), pp. 1630-1635. (11th IFAC Conference on Manufacturing Modelling, Management and Control, MIM 2025 Trondheim (Norway) 2025) [10.1016/j.ifacol.2025.09.274]. 1-gen-2025 Ferrari A.Mangano G.Zenezini G. 1-s2.0-S2405896325010353-main.pdf
Implementing Digital Twins in Supply Chain Management: A Maturity Model / Zenezini, G., Lagorio, A., Mangano, G., Pinto, R., Rafele, C.. - 59:(2025), pp. 1516-1521. (11th IFAC Conference on Manufacturing Modelling, Management and Control, MIM 2025 Norwegian University of Science and Technology (NTNU), nor 2025) [10.1016/j.ifacol.2025.09.255]. 1-gen-2025 Zenezini, GiovanniLagorio, AlexandraMangano, GiulioRafele, Carlo + 1-s2.0-S240589632501016X-main.pdf
Learning factory in logistics: Evaluation of the effects of a hands‐on experience for automated warehouse processes / Ferrari, A., Cagliano, A.C., Zenezini, G., Carlin, A., Mangano, G.. - In: DECISION SCIENCES JOURNAL OF INNOVATIVE EDUCATION. - ISSN 1540-4595. - 23:4(2025). [10.1111/dsji.70015] 1-gen-2025 Ferrari, AndreaCagliano, Anna CorinnaZenezini, GiovanniCarlin, AntonioMangano, Giulio Decision Sci J Innov Edu - 2025 - Ferrari - Learning factory in logistics Evaluation of the effects of a handsâ on.pdf
Modelling system dynamics as a socio-ecological perspective to support human-beaver interactions / Treves, A., Zenezini, G., Comino, E.. - In: ECOLOGICAL MODELLING. - ISSN 0304-3800. - 503:(2025). [10.1016/j.ecolmodel.2025.111057] 1-gen-2025 Treves A.Zenezini G.Comino E. 1-s2.0-S0304380025000432-main.pdf
Once concessioned, twice shy? Asymmetries of “reconcession” in national PPP programs / Castelblanco, G., Mangano, G., Zenezini, G., De Marco, A.. - In: CONSTRUCTION MANAGEMENT AND ECONOMICS. - ISSN 0144-6193. - (2025), pp. 1-23. [10.1080/01446193.2024.2448975] 1-gen-2025 Mangano G.Zenezini G.De Marco A. + -
Overall Warehouse Effectiveness (OWE): A New Integrated Performance Indicator for Warehouse Operations / Chiaraviglio, A., Grimaldi, S., Zenezini, G., Rafele, C.. - In: LOGISTICS. - ISSN 2305-6290. - 9:1(2025). [10.3390/logistics9010007] 1-gen-2025 Chiaraviglio A.Grimaldi S.Zenezini G.Rafele C. logistics-09-00007.pdf
Project Management Information Systems: A Systematic Review / Rebuglio, M., Zenezini, G., Ottaviani, F.M., De Marco, A.. - In: PROCEDIA COMPUTER SCIENCE. - ISSN 1877-0509. - 256:(2025), pp. 1739-1747. (16th International Conference on ENTERprise Information Systems, CENTERIS 2024 - 12th International Conference on Project MANagement, ProjMAN 2024 - 14th International Conference on Health and Social Care Information Systems and Technologies, HCist 2024 Pestana Casino Park Ocean and SPA hotel, prt 2024) [10.1016/j.procs.2025.02.313]. 1-gen-2025 Rebuglio, MZenezini G.Ottaviani F. M.De Marco A. 1-s2.0-S1877050925006817-main.pdf
System-Level Critical Success Factors for BIM Implementation in Construction Management: An AHP Approach / Ottaviani, F.M., Zenezini, G., Saba, F., De Marco, A., Gavinelli, L.. - In: SYSTEMS. - ISSN 2079-8954. - ELETTRONICO. - 13:2(2025). [10.3390/systems13020094] 1-gen-2025 Ottaviani F. M.Zenezini G.Saba F.De Marco A. + systems-13-00094-v2 (1).pdf
Use of NextGenerationEU plan funds: Investigation of an Italian Region / De Marco, A., Mangano, G., Ottaviani, F.M., Zenezini, G., Saba, F., Muzzolon, C.. - In: PROCEDIA COMPUTER SCIENCE. - ISSN 1877-0509. - 256:(2025), pp. 1505-1512. (16th International Conference on ENTERprise Information Systems, CENTERIS 2024 - 12th International Conference on Project MANagement, ProjMAN 2024 - 14th International Conference on Health and Social Care Information Systems and Technologies, HCist 2024 Pestana Casino Park Ocean and SPA hotel, prt 2024) [10.1016/j.procs.2025.02.284]. 1-gen-2025 De Marco A.Mangano G.Ottaviani F. M.Zenezini G.Saba F. + 1-s2.0-S1877050925006520-main (1).pdf
A Conceptual Model for Integrating Agile Practices into Systems Engineering Management / Ottaviani, F.M., Zenezini, G., Rebuglio, M., Narbaev, T., De Marco, A.. - In: ...SUMMER SCHOOL FRANCESCO TURCO. PROCEEDINGS. - ISSN 2283-8996. - (2024). (29th Summer School Francesco Turco, 2024 Otranto (IT) 2024). 1-gen-2024 Ottaviani F. M.Zenezini G.Rebuglio M.Narbaev T.De Marco A. 1134_Ottaviani.pdf
A Conversationally Enabled Decision Support System for Supply Chain Management: A Conceptual Framework / Pinto, R., Lagorio, A., Ciceri, C., Mangano, G., Zenezini, G., Rafele, C.. - 58:(2024), pp. 801-806. (18th IFAC Symposium on Information Control Problems in Manufacturing, INCOM 2024 aut 2024) [10.1016/j.ifacol.2024.09.198]. 1-gen-2024 Mangano, GiulioZenezini, GiovanniRafele, Carlo + Pintoetal2024.pdf
A method for developing and validating simulation models for automated storage and retrieval system digital twins / Ferrari, A., Carlin, A., Rafele, C., Zenezini, G.. - In: INTERNATIONAL JOURNAL, ADVANCED MANUFACTURING TECHNOLOGY. - ISSN 0268-3768. - ELETTRONICO. - 131:(2024), pp. 5369-5382. [10.1007/s00170-023-12660-y] 1-gen-2024 Ferrari A.Carlin A.Rafele C.Zenezini G. s00170-023-12660-y.pdf
Empirical Grounded Simulation Models for Make-To-Order (MTO) Supply Chains: An Application in the Furniture Industry / Lagorio, A., Mangano, G., Pinto, R., Rafele, C., Zenezini, G.. - 733:(2024), pp. 78-91. (43rd IFIP WG 5.7 International Conference on Advances in Production Management Systems, APMS 2024 deu 2024) [10.1007/978-3-031-71645-4_6]. 1-gen-2024 Mangano G.Rafele C.Zenezini G. + -