NARBAEV, TIMUR
NARBAEV, TIMUR
Dipartimento di Ingegneria Gestionale e della Produzione
025463
Automated machine learning pipeline for robust project cost and duration forecasting
2025 Ottaviani, F. M.; Ballesteros-Perez, P.; Narbaev, T.
Pandemic risks in PPPs: comparative analysis within developing countries
2025 Castelblanco, G.; Narbaev, T.; Osei-Kyei, R.; Serikbay, D.; Mukashev, Y.; Guevara, J.
Work rate-based indicators for improving project performance regression models
2025 Ottaviani, F. M.; De Marco, A.; Narbaev, T.; Ballesteros-Perez, P.
A machine learning study to improve the reliability of project cost estimates
2024 Narbaev, Timur; Hazir, Öncü; Khamitova, Balzhan; Talgat, Sayazhan
Building Urban Community Resilience against Hazards through Public-Private Partnerships: A Review of Critical Resilience Strategies
2024 Osei-Kyei, R.; Ampratwum, G.; Tam, V. W. Y.; Komac, U.; Narbaev, T.
Critical analysis of the emerging flood disaster resilience assessment indicators
2024 Osei-Kyei, R.; Ampratwum, G.; Komac, U.; Narbaev, T.
Critical review of the drivers and barriers for adopting net zero carbon procurement for construction projects
2024 Osei-Kyei, R.; Narbaev, T.; Xiaohua, J.; Komac, U.; Akomea-Frimpong, I.; Castelblanco, G.
Eliminating Sub-Optimality in Earned Value Management Scheduling
2024 Capone, C.; Kretzschmar, G.; Narbaev, T.
Improving Project Estimates at Completion through Progress-Based Performance Factors
2024 Ottaviani, F. M.; De Marco, A.; Narbaev, T.; Rebuglio, M.
Modeling daily energy use in British homes amidst the electricity market crisis: Insights from smart meter and socio-technical data
2024 Chang, Lei; Narbaev, Timur; Taghizadeh-Hesary, Farhad; Mohsin, Muhammad
Critical success criteria for retirement village public – private partnership housing
2023 Osei-Kyei, R.; Narbaev, T.; Atafo-Adabre, M.; Chileshe, N.; Ofori-Kuragu, J. K.
How natural resources collaboration affects the pollutants level and economic growth: Novel evidence from China
2023 Zhang, D.; Narbaev, T.; Cheng, J.; Mushravan, A. A.
Influence of cost contingency management on project estimates at completion
2023 DE MARCO, Alberto; Narbaev, Timur; Ottaviani, FILIPPO MARIA; Vanhoucke, Mario
A META-ANALYSIS OF THE PUBLIC-PRIVATE PARTNERSHIP LITERATURE REVIEWS: EXPLORING THE IDENTITY OF THE FIELD
2022 Narbaev, T.
A Review of the Use of Game Theory in Project Management
2022 Narbaev, T.; Hazlr, O.; Agi, M.
A Scientometric Analysis of Studies on Risk Management in Construction Projects
2022 Osei-Kyei, R.; Narbaev, T.; Ampratwum, G.
The Research Environment in a Developing Economy: Reforms, Patterns, and Challenges in Kazakhstan
2022 Amirbekova, D.; Narbaev, T.; Kussaiyn, M.
Factors of schedule and cost performance of tunnel construction megaprojects
2021 De Marco, A.; Narbaev, T.
Research productivity in emerging economies: Empirical evidence from kazakhstan
2021 Narbaev, T.; Amirbekova, D.
A multi-disciplinary meta-review of the public–private partnerships research
2020 Narbaev, T.; De Marco, A.; Orazalin, N.
Citazione | Data di pubblicazione | Autori | File |
---|---|---|---|
Automated machine learning pipeline for robust project cost and duration forecasting / Ottaviani, F. M.; Ballesteros-Perez, P.; Narbaev, T.. - In: AUTOMATION IN CONSTRUCTION. - ISSN 0926-5805. - ELETTRONICO. - 178:(2025). [10.1016/j.autcon.2025.106426] | 1-gen-2025 | Ottaviani F. M.Narbaev T. + | 1-s2.0-S0926580525004662-main (3).pdf |
Pandemic risks in PPPs: comparative analysis within developing countries / Castelblanco, G.; Narbaev, T.; Osei-Kyei, R.; Serikbay, D.; Mukashev, Y.; Guevara, J.. - In: THE INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT. - ISSN 1562-3599. - ELETTRONICO. - (2025), pp. 1-13. [10.1080/15623599.2024.2336660] | 1-gen-2025 | Narbaev T. + | Castelblanco et al_IJCM_2024_Pandemic risks in PPPs.pdf |
Work rate-based indicators for improving project performance regression models / Ottaviani, F. M.; De Marco, A.; Narbaev, T.; Ballesteros-Perez, P.. - In: THE INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT. - ISSN 1562-3599. - (2025), pp. 1-14. [10.1080/15623599.2025.2508293] | 1-gen-2025 | Ottaviani F. M.De Marco A.Narbaev T. + | - |
A machine learning study to improve the reliability of project cost estimates / Narbaev, Timur; Hazir, Öncü; Khamitova, Balzhan; Talgat, Sayazhan. - In: INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH. - ISSN 0020-7543. - 62:12(2024), pp. 4372-4388. [10.1080/00207543.2023.2262051] | 1-gen-2024 | Timur Narbaev + | A machine learning study to improve the reliability of project cost estimates.pdf |
Building Urban Community Resilience against Hazards through Public-Private Partnerships: A Review of Critical Resilience Strategies / Osei-Kyei, R.; Ampratwum, G.; Tam, V. W. Y.; Komac, U.; Narbaev, T.. - In: BUILDINGS. - ISSN 2075-5309. - ELETTRONICO. - 14:7(2024), pp. 1-20. [10.3390/buildings14071947] | 1-gen-2024 | Narbaev T. + | Osei-Kyei et al_B_2024_Review of resilience against hazards through PPP.pdf |
Critical analysis of the emerging flood disaster resilience assessment indicators / Osei-Kyei, R.; Ampratwum, G.; Komac, U.; Narbaev, T.. - In: INTERNATIONAL JOURNAL OF DISASTER RESILIENCE IN THE BUILT ENVIRONMENT. - ISSN 1759-5908. - ELETTRONICO. - (2024), pp. 1-20. [10.1108/IJDRBE-02-2024-0029] | 1-gen-2024 | Narbaev T. + | Osei-Kyei et al_IJDREB_2024_Critical analysis of the emerging flood disaster.pdf |
Critical review of the drivers and barriers for adopting net zero carbon procurement for construction projects / Osei-Kyei, R.; Narbaev, T.; Xiaohua, J.; Komac, U.; Akomea-Frimpong, I.; Castelblanco, G.. - In: SUSTAINABLE FUTURES. - ISSN 2666-1888. - ELETTRONICO. - 8:(2024), pp. 1-10. [10.1016/j.sftr.2024.100284] | 1-gen-2024 | Narbaev T. + | Osei_SS_2024_Critical review of the drivers and barriers.pdf |
Eliminating Sub-Optimality in Earned Value Management Scheduling / Capone, C.; Kretzschmar, G.; Narbaev, T.. - In: IEEE ACCESS. - ISSN 2169-3536. - ELETTRONICO. - 12:(2024), pp. 134027-134040. [10.1109/ACCESS.2024.3460535] | 1-gen-2024 | Narbaev T. + | Capone et al_IEEEA_2024_Eliminating_Sub-Optimality_in_EVM_Scheduling.pdf |
Improving Project Estimates at Completion through Progress-Based Performance Factors / Ottaviani, F. M.; De Marco, A.; Narbaev, T.; Rebuglio, M.. - In: BUILDINGS. - ISSN 2075-5309. - 14:3(2024). [10.3390/buildings14030643] | 1-gen-2024 | Ottaviani F. M.De Marco A.Narbaev T.Rebuglio M. | buildings-14-00643 (5).pdf |
Modeling daily energy use in British homes amidst the electricity market crisis: Insights from smart meter and socio-technical data / Chang, Lei; Narbaev, Timur; Taghizadeh-Hesary, Farhad; Mohsin, Muhammad. - In: ENERGY ECONOMICS. - ISSN 0140-9883. - ELETTRONICO. - 139:(2024), pp. 1-8. [10.1016/j.eneco.2024.107933] | 1-gen-2024 | Narbaev, Timur + | Chang et al_ee_2024_energy use in British homes.pdf |
Critical success criteria for retirement village public – private partnership housing / Osei-Kyei, R.; Narbaev, T.; Atafo-Adabre, M.; Chileshe, N.; Ofori-Kuragu, J. K.. - In: CONSTRUCTION INNOVATION. - ISSN 1471-4175. - ELETTRONICO. - 23:5(2023), pp. 1018-1037. [10.1108/CI-11-2021-0206] | 1-gen-2023 | Narbaev T. + | 10-1108_ci-11-2021-0206.pdf |
How natural resources collaboration affects the pollutants level and economic growth: Novel evidence from China / Zhang, D.; Narbaev, T.; Cheng, J.; Mushravan, A. A.. - In: RESOURCES POLICY. - ISSN 0301-4207. - 85:(2023). [10.1016/j.resourpol.2023.103801] | 1-gen-2023 | Narbaev T. + | 1-s2.0-S0301420723005123-main.pdf |
Influence of cost contingency management on project estimates at completion / DE MARCO, Alberto; Narbaev, Timur; Ottaviani, FILIPPO MARIA; Vanhoucke, Mario. - In: THE INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT. - ISSN 1562-3599. - ELETTRONICO. - (2023), pp. 1-11. [10.1080/15623599.2023.2239487] | 1-gen-2023 | De Marco AlbertoNarbaev TimurOttaviani Filippo Maria + | Influence of cost contingency management on project estimates at completion.pdf |
A META-ANALYSIS OF THE PUBLIC-PRIVATE PARTNERSHIP LITERATURE REVIEWS: EXPLORING THE IDENTITY OF THE FIELD / Narbaev, T.. - In: INTERNATIONAL JOURNAL OF STRATEGIC PROPERTY MANAGEMENT. - ISSN 1648-715X. - 26:4(2022), pp. 318-331. [10.3846/ijspm.2022.17860] | 1-gen-2022 | Narbaev T. | 17860-Article Text-69317-2-10-20221107.pdf |
A Review of the Use of Game Theory in Project Management / Narbaev, T.; Hazlr, O.; Agi, M.. - In: JOURNAL OF MANAGEMENT IN ENGINEERING. - ISSN 0742-597X. - 38:6(2022). [10.1061/(ASCE)ME.1943-5479.0001092] | 1-gen-2022 | Narbaev T. + | narbaev-et-al-2022-a-review-of-the-use-of-game-theory-in-project-management.pdf |
A Scientometric Analysis of Studies on Risk Management in Construction Projects / Osei-Kyei, R.; Narbaev, T.; Ampratwum, G.. - In: BUILDINGS. - ISSN 2075-5309. - 12:9(2022). [10.3390/buildings12091342] | 1-gen-2022 | Narbaev T. + | buildings-12-01342.pdf |
The Research Environment in a Developing Economy: Reforms, Patterns, and Challenges in Kazakhstan / Amirbekova, D.; Narbaev, T.; Kussaiyn, M.. - In: PUBLICATIONS. - ISSN 2304-6775. - 10:4(2022). [10.3390/publications10040037] | 1-gen-2022 | Narbaev T. + | publications-10-00037-v2.pdf |
Factors of schedule and cost performance of tunnel construction megaprojects / De Marco, A.; Narbaev, T.. - In: THE OPEN CIVIL ENGINEERING JOURNAL. - ISSN 1874-1495. - ELETTRONICO. - 15:1(2021), pp. 38-49. [10.2174/1874149502115010038] | 1-gen-2021 | De Marco A.Narbaev T. | TOCIEJ-15-38.pdf |
Research productivity in emerging economies: Empirical evidence from kazakhstan / Narbaev, T.; Amirbekova, D.. - In: PUBLICATIONS. - ISSN 2304-6775. - 9:4(2021). [10.3390/publications9040051] | 1-gen-2021 | Narbaev T. + | publications-09-00051.pdf |
A multi-disciplinary meta-review of the public–private partnerships research / Narbaev, T.; De Marco, A.; Orazalin, N.. - In: CONSTRUCTION MANAGEMENT AND ECONOMICS. - ISSN 0144-6193. - STAMPA. - 38:2(2020), pp. 109-125. [10.1080/01446193.2019.1643033] | 1-gen-2020 | Narbaev T.De Marco A. + | Narbaev et al_CME_2020_A multi disciplinary meta review of the PPP research_PostPrint.pdf; A multi disciplinary meta review of the public private partnerships research.pdf |