Identification and Prioritisation of Digital Transformation Projects Selection Criteria / Ottaviani, F. M.; Narbaev, T.; Carlin, A.; Ortiz, M. L.. - In: ...SUMMER SCHOOL FRANCESCO TURCO. PROCEEDINGS. - ISSN 2283-8996. - (2023). (Intervento presentato al convegno 28th Summer School Francesco Turco, 2023 tenutosi a Genova). 1-gen-2023 Ottaviani F. M.Narbaev T.Carlin A. + Camera_ready_ID33.pdf
Understanding Schedule Progress Using Earned Value and Earned Schedule Techniques at Path-Level / Capone, C.; Narbaev, T.. - 634:(2021), pp. 244-251. (Intervento presentato al convegno IFIP WG 5.7 International Conference on Advances in Production Management Systems, APMS 2021 tenutosi a fra nel 2021) [10.1007/978-3-030-85914-5_26]. 1-gen-2021 Narbaev T. + 520762_1_En_26_Chapter-2-11.pdf
Integrating risk in project cost forecasting / De Marco, A.; Narbaev, T.; Rafele, C.; Cagliano, A. C.. - In: ...SUMMER SCHOOL FRANCESCO TURCO. PROCEEDINGS. - ISSN 2283-8996. - STAMPA. - 2017:(2017), pp. 117-122. (Intervento presentato al convegno 22nd Summer School "Francesco Turco" - Industrial Systems Engineering 2017 tenutosi a Mondello Palace Hotel, Viale Principe di Scalea, ita nel 2017). 1-gen-2017 De Marco, A.Narbaev, T.Rafele, C.Cagliano, A. C. DeMarcoetal_AidiSS2017_CEACwCont_Manuscript_r1.pdf
Risk-Integrated Project Monitoring and Forecasting Framework for a PM Organization / Narbaev, Timur; DE MARCO, Alberto; Thaheem, MUHAMMAD JAMALUDDIN. - ELETTRONICO. - (2017). (Intervento presentato al convegno The 30th IPMA World Congress "Breakthrough competences for managing change" tenutosi a Astana, Kazakstan nel 5-7 September 2017). 1-gen-2017 Timur NarbaevAlberto De MarcoMuhammad Jamaluddin Thaheem -
Risk-Adjusted Contingency Management in Construction Projects / Thaheem, MUHAMMAD JAMALUDDIN; DE MARCO, Alberto; Narbaev, Timur. - STAMPA. - (2013), pp. 191-195. (Intervento presentato al convegno International Conference on Safety, Construction Engineering, and Project Management tenutosi a Islamabad nel August 19-21, 2013). 1-gen-2013 THAHEEM, MUHAMMAD JAMALUDDINDE MARCO, AlbertoNARBAEV, TIMUR ICSCEPM2013 Proceedings_Paper 2.pdf
Combination of a Nonlinear Regression Model and Earned Schedule to Forecast a Project Final Cost / Narbaev, Timur; DE MARCO, Alberto. - STAMPA. - (2012), pp. 22-25. (Intervento presentato al convegno The 4th European Conference on Integrated Projects Controls tenutosi a Twente (The Netherlands) nel 28-29 November 2012). 1-gen-2012 NARBAEV, TIMURDE MARCO, Alberto -
Cost Estimate at Completion Methods in Construction Projects / Narbaev, Timur; DE MARCO, Alberto. - STAMPA. - 15:(2011), pp. 32-36. (Intervento presentato al convegno 2nd International Conference on Construction and Project Management tenutosi a Singapore nel 16-18 September 2011). 1-gen-2011 NARBAEV, TIMURDE MARCO, Alberto -
Using Project Financing to Develop Constructed Facilities in Italy / DE MARCO, Alberto; Mangano, Giulio; Narbaev, Timur. - STAMPA. - 15:(2011), pp. 11-15. (Intervento presentato al convegno 2nd International Conference on Construction and Project Management tenutosi a Singapore nel September 16-18 2011). 1-gen-2011 DE MARCO, AlbertoMANGANO, GIULIONARBAEV, TIMUR -