The mining activity in a quarry in Northern Italy involves the excavation of limestone by drilling and blasting for cement production. In the context of this activity, a recent accident involved the projection of rock fragments outside the quarry area during a production blast. The accident is attributable to evident inaccuracies in drilling that led to the failure to comply with the parameters established in the authorised blast scheme. According to what was observed on site, the leading causes of these inaccuracies are due partly to possible deviations of the holes during the drilling phase and partly to the lack of regularity of the excavation faces. The paper proposes new blast schemes to continue the activity. These schemes are a solution and a call for expertise and skill. Knowledge and commitment are crucial in ensuring the success of these schemes, which are designed to eliminate or at least reduce the effect of the two factors (deviation of the holes and irregularity of the residual faces) during the execution of the production blasts.

The problem of flyrock in a limestone quarry in Northern Italy: analysis of the causes and mitigation interventions / Cardu, Marilena; Martinelli, Daniele; Seccatore, Jacopo; Lara, M.. - STAMPA. - 1:(2025), pp. 723-730. (Intervento presentato al convegno 14th International Symposium on Rock Fragmentation by Blasting tenutosi a Antalya nel 7-10 aprile 2025).

The problem of flyrock in a limestone quarry in Northern Italy: analysis of the causes and mitigation interventions

Cardu, Marilena;Martinelli, Daniele;
2025

Abstract

The mining activity in a quarry in Northern Italy involves the excavation of limestone by drilling and blasting for cement production. In the context of this activity, a recent accident involved the projection of rock fragments outside the quarry area during a production blast. The accident is attributable to evident inaccuracies in drilling that led to the failure to comply with the parameters established in the authorised blast scheme. According to what was observed on site, the leading causes of these inaccuracies are due partly to possible deviations of the holes during the drilling phase and partly to the lack of regularity of the excavation faces. The paper proposes new blast schemes to continue the activity. These schemes are a solution and a call for expertise and skill. Knowledge and commitment are crucial in ensuring the success of these schemes, which are designed to eliminate or at least reduce the effect of the two factors (deviation of the holes and irregularity of the residual faces) during the execution of the production blasts.
2025
978-605-01-1665-6
File in questo prodotto:
File Dimensione Formato  
The problem of Flyrock in a limestone quarry in Northern Italy_analysis of the causes and mitigation interventions.pdf

accesso riservato

Tipologia: 2. Post-print / Author's Accepted Manuscript
Licenza: Non Pubblico - Accesso privato/ristretto
Dimensione 1.16 MB
Formato Adobe PDF
1.16 MB Adobe PDF   Visualizza/Apri   Richiedi una copia
Pubblicazioni consigliate

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11583/2999155