The progress of the Thales TH1509U 170 GHz 1 MW CW industrial gyrotron is discussed in this paper. The tube is currently under test to assess the compliance with the ITER gyrotron requirements.

Progress on TH1509U 170 GHz 1 MW European Gyrotron Program / Leggieri, Alberto; Albajar, Ferran; Alberti, Stefano; Allio, Andrea; Avramidis, Kostantinos A.; Bariou, David; Bin, William; Bruschi, Alex; Chelis, Ioannis; Difonzo, Rosa; Fanale, Francesco; Gantenbein, Gerd; Goodman, Tim; Hogge, Jean-Philippe; Illy, Stefan; Ioannidis, Zisis; Jelonnek, John; Jin, Jianbo; Latsas, George; Legrand, François; Lietaer, Gerald; Lievin, Christophe; Marchesin, Rodolphe; Rzesnicki, Tomasz; Sanchez, Francisco; Savoldi, Laura; Stanculovic, Sebastian; Tigelis, Ioannis; Torreblanca, Humberto; Thumm, Manfred. - (2022), pp. 118-119. (Intervento presentato al convegno 2022 23rd International Vacuum Electronics Conference (IVEC) tenutosi a Monterey, CA, USA nel 25-29 April 2022) [10.1109/ivec53421.2022.10292293].

Progress on TH1509U 170 GHz 1 MW European Gyrotron Program

Leggieri, Alberto;Allio, Andrea;Bin, William;Difonzo, Rosa;Savoldi, Laura;
2022

Abstract

The progress of the Thales TH1509U 170 GHz 1 MW CW industrial gyrotron is discussed in this paper. The tube is currently under test to assess the compliance with the ITER gyrotron requirements.
File in questo prodotto:
Non ci sono file associati a questo prodotto.
Pubblicazioni consigliate

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11583/2989581
 Attenzione

Attenzione! I dati visualizzati non sono stati sottoposti a validazione da parte dell'ateneo