The information model set up in the design phases can be used in site monitoring. The contribution defines a possible application frontier that employs automatic data processing methodologies and amplifies the possibilities of the construction and management model.
Il BIM per il Construction Management. Il caso della Domus Eleganza a Milano // BIM for Construction Management. The case of the Domus Eleganza in Milan / Lo Turco, Massimiliano; Bocconcino, Maurizio Marco; Vozzola, Mariapaola; Giovannini, Elisabetta Caterina; Tomalini, Andrea. - ELETTRONICO. - (2021), pp. 462-481. (Intervento presentato al convegno 3D Modeling & BIM 2021 - Digital Twin tenutosi a on-line nel 14 april 2021).
Il BIM per il Construction Management. Il caso della Domus Eleganza a Milano // BIM for Construction Management. The case of the Domus Eleganza in Milan
Lo Turco, Massimiliano;Bocconcino, Maurizio Marco;Vozzola, Mariapaola;Giovannini, Elisabetta Caterina;Tomalini, Andrea
2021
Abstract
The information model set up in the design phases can be used in site monitoring. The contribution defines a possible application frontier that employs automatic data processing methodologies and amplifies the possibilities of the construction and management model.File | Dimensione | Formato | |
---|---|---|---|
3DMOD&BIM_2021_LoTurcoetal_a.pdf
non disponibili
Tipologia:
2a Post-print versione editoriale / Version of Record
Licenza:
Non Pubblico - Accesso privato/ristretto
Dimensione
5.54 MB
Formato
Adobe PDF
|
5.54 MB | Adobe PDF | Visualizza/Apri Richiedi una copia |
Pubblicazioni consigliate
I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.
https://hdl.handle.net/11583/2935051