Among the digitalization processes which are being raised in Europe and in the world, the building permit process is seen as one of the priorities by municipalities, governmental institutions and standardization organizations. However, in current practice, the building permit issuing as well as the integration of geoinformation with BIM (GeoBIM) suffers from a number of complex sub-issues. These issues still remain and prevent the development of successful methodologies. In this paper, the building permit use case is explored within a project in close collaboration with the municipality of Rotterdam. A very specific case study in Rotterdam was selected as a starting point, which allowed us to develop the needed methodology for the implementation of an effective tool. In this paper we highlight the interpretation and formalization of regulation for building height, overhang and tower ratio. While these rules are specific to a zoning plan in Rotterdam, we believe that the methodology and encountered issues in formalizing the rules, applying the rules on delivered models and integrating various data sources (BIM and GIS specifically) are general to most building codes.

Geobim for digital building permit process: Learning from a case study in Rotterdam / Noardo, F.; Wu, T.; Arroyo Ohori, K.; Krijnen, T.; Tezerdi, H.; Stoter, J.. - ELETTRONICO. - 6:(2020), pp. 151-158. (Intervento presentato al convegno 3rd BIM/GIS Integration Workshop and 15th 3D GeoInfo Conference tenutosi a London, UK nel 7–11 September 2020) [10.5194/isprs-annals-VI-4-W1-2020-151-2020].

Geobim for digital building permit process: Learning from a case study in Rotterdam

Noardo F.;
2020

Abstract

Among the digitalization processes which are being raised in Europe and in the world, the building permit process is seen as one of the priorities by municipalities, governmental institutions and standardization organizations. However, in current practice, the building permit issuing as well as the integration of geoinformation with BIM (GeoBIM) suffers from a number of complex sub-issues. These issues still remain and prevent the development of successful methodologies. In this paper, the building permit use case is explored within a project in close collaboration with the municipality of Rotterdam. A very specific case study in Rotterdam was selected as a starting point, which allowed us to develop the needed methodology for the implementation of an effective tool. In this paper we highlight the interpretation and formalization of regulation for building height, overhang and tower ratio. While these rules are specific to a zoning plan in Rotterdam, we believe that the methodology and encountered issues in formalizing the rules, applying the rules on delivered models and integrating various data sources (BIM and GIS specifically) are general to most building codes.
File in questo prodotto:
File Dimensione Formato  
isprs-annals-VI-4-W1-2020-151-2020.pdf

accesso aperto

Tipologia: 2a Post-print versione editoriale / Version of Record
Licenza: Creative commons
Dimensione 9.28 MB
Formato Adobe PDF
9.28 MB Adobe PDF Visualizza/Apri
Pubblicazioni consigliate

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11583/2856628