The project of the new railway line Turin Lyon is an exemplary case of unnecessary work. It should overlap a railway tunnel and an international railway line with modern features; traffic data show since 2000 a collapse of road and rail movements along the corridor Italian French interested; after 14 years of experimentation its modal transfer capacity has always given negative results; the new line would not be interoperable with the rest of the Italian and French network because it has its own, even different, links between the Italian and the French of the same line. The studies carried out on the energy consumption and CO2 production of the Turin Lyon in the construction phase, which requires the excavation of 42 million cubic meters of rock, and the management of energy consumption of the ventilation and refrigeration of the base tunnel, give a negative energy balance for the new work. Finally, because the size of the necessary works and their enormous cost would have very heavy effects on the environment and on the resources to be dedicated to the critical issues of the remaining national network and to the real needs of citizens.
THE HIGH-SPEED RAIL HANDBOOK: A TECHNICAL GUIDE / Cavargna, Mario; Zucchetti, Massimo. - In: INTERNATIONAL JOURNAL OF ECOSYSTEMS AND ECOLOGY SCIENCE. - ISSN 2224-4980. - STAMPA. - 8:3(2018), pp. 515-530. [10.31407/ijees8311]
THE HIGH-SPEED RAIL HANDBOOK: A TECHNICAL GUIDE
Zucchetti, Massimo
2018
Abstract
The project of the new railway line Turin Lyon is an exemplary case of unnecessary work. It should overlap a railway tunnel and an international railway line with modern features; traffic data show since 2000 a collapse of road and rail movements along the corridor Italian French interested; after 14 years of experimentation its modal transfer capacity has always given negative results; the new line would not be interoperable with the rest of the Italian and French network because it has its own, even different, links between the Italian and the French of the same line. The studies carried out on the energy consumption and CO2 production of the Turin Lyon in the construction phase, which requires the excavation of 42 million cubic meters of rock, and the management of energy consumption of the ventilation and refrigeration of the base tunnel, give a negative energy balance for the new work. Finally, because the size of the necessary works and their enormous cost would have very heavy effects on the environment and on the resources to be dedicated to the critical issues of the remaining national network and to the real needs of citizens.File | Dimensione | Formato | |
---|---|---|---|
2018 High Speed Rail Cavargna Zucchetti IJEES.pdf
accesso riservato
Descrizione: Articolo a stampa
Tipologia:
2a Post-print versione editoriale / Version of Record
Licenza:
Non Pubblico - Accesso privato/ristretto
Dimensione
629.23 kB
Formato
Adobe PDF
|
629.23 kB | Adobe PDF | Visualizza/Apri Richiedi una copia |
Pubblicazioni consigliate
I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.
https://hdl.handle.net/11583/2783301