Infrastructural Building Information Modelling (infraBIM) is one of the most-talked topics of increasing interest nowadays. The object of the present study is a BIM-based development of the underground station Sevrain-Beaudottes. As the infrastructural projects are complex set of works, the case study must face various aspects of the design and construction process. This paper highlights the chance of taking advantages of BIM methodology for cost estimation and time scheduling. The pursued objectives have been achieved through an iterative process of interoperability tests.
A BIM-based infrastructural project approach for time and cost estimation / Fonsati, Arianna; Osello, Anna; Damiani, Alessandro. - ELETTRONICO. - RAPPRESENTAZIONE/MATERIALE/IMMATERIALE DRAWING AS (IN)TANGIBLE REPRESENTATION:(2018), pp. 1511-1514. (Intervento presentato al convegno RAPPRESENTAZIONE/MATERIALE/IMMATERIALE DRAWING AS (IN)TANGIBLE REPRESENTATION tenutosi a Milano nel Settembre 2018).
A BIM-based infrastructural project approach for time and cost estimation
Arianna Fonsati;Anna Osello;
2018
Abstract
Infrastructural Building Information Modelling (infraBIM) is one of the most-talked topics of increasing interest nowadays. The object of the present study is a BIM-based development of the underground station Sevrain-Beaudottes. As the infrastructural projects are complex set of works, the case study must face various aspects of the design and construction process. This paper highlights the chance of taking advantages of BIM methodology for cost estimation and time scheduling. The pursued objectives have been achieved through an iterative process of interoperability tests.Pubblicazioni consigliate
I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.
https://hdl.handle.net/11583/2718492
Attenzione
Attenzione! I dati visualizzati non sono stati sottoposti a validazione da parte dell'ateneo