Energy geo-structures such as piles, diaphragm walls, tunnel linings and anchors are rapidly spreading in Europe and all around the world. They differ from traditional geotechnical infrastructures because they are equipped with absorber pipes. The working fluid circulating in the pipes extracts or injects heat into the ground depending on the season in order to heat or cool, respectively, the surrounding buildings or de-ice infrastructures. Most current practical applications are related to energy piles and retaining walls, but some examples of energy tunnels can be found in recent literature. Tunnels are particularly suited for this kind of application thanks to the large volume of ground involved and the wide heat exchange surface. Today, a large number of urban tunnels are constructed using tunnel boring machine (TBM) and segmental linings. This is also the case for Turin Metro Line 1, which is currently being extended southward, from Lingotto to Piazza Bengasi (1.9 km of tunnel length and 2 stations). Previous studies demonstrate the presence of favorable underground water flow conditions for the application of low enthalpy geothermal technology. An experimental site consisting of two thermally activated rings was designed by the authors to be installed during construction of this new section of Turin metro. Pipes are placed in each segment in a meandering fashion, along the circumferential direction, perpendicularly to the tunnel axis. A number of sensors are integrated in the segmental lining before pre-casting, with the aim of measuring strains, stresses and temperatures. Moreover, temperature sensors are located inside the tunnel and in the ground at various distances from the tunnel, together with piezometers. After monitoring the background in-situ conditions, activating and verifying the correct operation of the installation, heating and cooling mode tests will be performed to investigate the efficiency of the thermal lining and validate or calibrate predictive numerical analyses against real in-situ data.

Energy Tunnel Experimental Site in Turin Metro / Barla, Marco; DI DONNA, Alice; Insana, Alessandra. - ELETTRONICO. - (2017), pp. 1-10. (Intervento presentato al convegno 15th International Conference of the International Association for Computer Methods and Advances in Geomechanics (15th IACMAG) tenutosi a Wuhan (Cina) nel 19-23 Ottobre 2017).

Energy Tunnel Experimental Site in Turin Metro

Marco Barla;Alice Di Donna;Alessandra Insana
2017

Abstract

Energy geo-structures such as piles, diaphragm walls, tunnel linings and anchors are rapidly spreading in Europe and all around the world. They differ from traditional geotechnical infrastructures because they are equipped with absorber pipes. The working fluid circulating in the pipes extracts or injects heat into the ground depending on the season in order to heat or cool, respectively, the surrounding buildings or de-ice infrastructures. Most current practical applications are related to energy piles and retaining walls, but some examples of energy tunnels can be found in recent literature. Tunnels are particularly suited for this kind of application thanks to the large volume of ground involved and the wide heat exchange surface. Today, a large number of urban tunnels are constructed using tunnel boring machine (TBM) and segmental linings. This is also the case for Turin Metro Line 1, which is currently being extended southward, from Lingotto to Piazza Bengasi (1.9 km of tunnel length and 2 stations). Previous studies demonstrate the presence of favorable underground water flow conditions for the application of low enthalpy geothermal technology. An experimental site consisting of two thermally activated rings was designed by the authors to be installed during construction of this new section of Turin metro. Pipes are placed in each segment in a meandering fashion, along the circumferential direction, perpendicularly to the tunnel axis. A number of sensors are integrated in the segmental lining before pre-casting, with the aim of measuring strains, stresses and temperatures. Moreover, temperature sensors are located inside the tunnel and in the ground at various distances from the tunnel, together with piezometers. After monitoring the background in-situ conditions, activating and verifying the correct operation of the installation, heating and cooling mode tests will be performed to investigate the efficiency of the thermal lining and validate or calibrate predictive numerical analyses against real in-situ data.
File in questo prodotto:
Non ci sono file associati a questo prodotto.
Pubblicazioni consigliate

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11583/2695406
 Attenzione

Attenzione! I dati visualizzati non sono stati sottoposti a validazione da parte dell'ateneo