This study develops an analytical approach to quantitatively model the efficiency of the pretensioning of grouted rockbolts in terms of reduction of tunnel convergence. In this study, the distribution of force along the pretensioned fully grouted bolt is calculated by the assumption of a rigid connection between the bolt and the rock mass. A compressive force is then applied to the bolt head on the tunnel surface to consider the shear relative displacement between the bolt and the rock mass. The magnitude of this compressive force is found by modeling the bolt boundaries’ stiffness. The theoretical proposed approach is simplified to be used for practical purposes. The results show that if the stiff end plate is tightened to the bolt head (complete planner contact), the grouting effect of the pretensioned fully grouted bolts on tunnel stability can be neglected.
Practical method for the design of pretensioned fully grouted rockbolts in tunnels / Ranjbarnia, Masoud; Fahimifar, Ahmad; Oreste, Pierpaolo. - In: INTERNATIONAL JOURNAL OF GEOMECHANICS. - ISSN 1532-3641. - STAMPA. - 16:1(2016), pp. 1-12. [10.1061/(ASCE)GM.1943-5622.0000464]
Practical method for the design of pretensioned fully grouted rockbolts in tunnels
ORESTE, PIERPAOLO
2016
Abstract
This study develops an analytical approach to quantitatively model the efficiency of the pretensioning of grouted rockbolts in terms of reduction of tunnel convergence. In this study, the distribution of force along the pretensioned fully grouted bolt is calculated by the assumption of a rigid connection between the bolt and the rock mass. A compressive force is then applied to the bolt head on the tunnel surface to consider the shear relative displacement between the bolt and the rock mass. The magnitude of this compressive force is found by modeling the bolt boundaries’ stiffness. The theoretical proposed approach is simplified to be used for practical purposes. The results show that if the stiff end plate is tightened to the bolt head (complete planner contact), the grouting effect of the pretensioned fully grouted bolts on tunnel stability can be neglected.File | Dimensione | Formato | |
---|---|---|---|
2016 Practical (ASCE)GM.1943-5622.0000464.pdf
accesso riservato
Tipologia:
2a Post-print versione editoriale / Version of Record
Licenza:
Non Pubblico - Accesso privato/ristretto
Dimensione
509.51 kB
Formato
Adobe PDF
|
509.51 kB | Adobe PDF | Visualizza/Apri Richiedi una copia |
A practical method_Ranjbarnia et al 2016 (002).pdf
accesso aperto
Tipologia:
2. Post-print / Author's Accepted Manuscript
Licenza:
Pubblico - Tutti i diritti riservati
Dimensione
525 kB
Formato
Adobe PDF
|
525 kB | Adobe PDF | Visualizza/Apri |
Pubblicazioni consigliate
I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.
https://hdl.handle.net/11583/2648616
Attenzione
Attenzione! I dati visualizzati non sono stati sottoposti a validazione da parte dell'ateneo