The conservation of architectural heritage encompasses various aspects of technical sciences. In large buildings, made and further modified in different stages with different materials and techniques, it is difficult to measure the “health” of its structure in a simple way. The monitoring through displacement gauges represents one of the less costly solutions for estimating the evolution of damage in an existing structure: evidence of damage is represented by an increase of displacements. Anyway, due to the nonlinear behavior of large constructions, it is possible that displacements are measured only when the damage is at an advanced stage. In this sense, urgent measures have to be taken for ensure the stability of the construction. A preliminary study of the monitoring system and a good calibration of the threshold displacement values is required in order to limit the uncertainty about the true damage evolution stage. At the end, a full example illustrating the strategy to adopt in monitoring an historical construction is proposed.
Effects of Alternate Load Paths in damage evolution and identification in architectural heritage / DE BIAGI, Valerio; Chiaia, Bernardino. - STAMPA. - (2014), pp. 807-814. (Intervento presentato al convegno Le vie dei Mercanti _ XII Forum Internazionale di Studi tenutosi a Aversa, Capri nel Giugno 2014).
Effects of Alternate Load Paths in damage evolution and identification in architectural heritage
DE BIAGI, VALERIO;CHIAIA, Bernardino
2014
Abstract
The conservation of architectural heritage encompasses various aspects of technical sciences. In large buildings, made and further modified in different stages with different materials and techniques, it is difficult to measure the “health” of its structure in a simple way. The monitoring through displacement gauges represents one of the less costly solutions for estimating the evolution of damage in an existing structure: evidence of damage is represented by an increase of displacements. Anyway, due to the nonlinear behavior of large constructions, it is possible that displacements are measured only when the damage is at an advanced stage. In this sense, urgent measures have to be taken for ensure the stability of the construction. A preliminary study of the monitoring system and a good calibration of the threshold displacement values is required in order to limit the uncertainty about the true damage evolution stage. At the end, a full example illustrating the strategy to adopt in monitoring an historical construction is proposed.File | Dimensione | Formato | |
---|---|---|---|
DeBiagiChiaia_Effects of Alternate Load Paths in damage evolution and identification in architectural heritage_PORTO.pdf
accesso aperto
Descrizione: Post-print
Tipologia:
2. Post-print / Author's Accepted Manuscript
Licenza:
Pubblico - Tutti i diritti riservati
Dimensione
2.39 MB
Formato
Adobe PDF
|
2.39 MB | Adobe PDF | Visualizza/Apri |
Pubblicazioni consigliate
I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.
https://hdl.handle.net/11583/2630001
Attenzione
Attenzione! I dati visualizzati non sono stati sottoposti a validazione da parte dell'ateneo