The Bio.Lea.R project has been selected for grant in Life+ Programme-Environmental Policy and Governance – Call 2009. It aims to compare the performance of a landfill for less reactive, biologically treated waste, managed as bioreactor, to that of a conventionally managed one, with regard to both environmental (especially in terms of biogas production) and economical aspects. During project lifetime (about 4 years), the waste moisture will be controlled using innovative and monitored liquid injection in order to extract higher biogas flow rates in a shorter time than the conventionally managed one.
FULL SCALE USE OF LIQUID INJECTION, FOR INNOVATIVE CONTROL OF WASTE MOISTURE TO ENHANCE BIOGAS PRODUCTION IN PRE TREATED WASTE LANDFILL (BIO.LEA.R.) / M., Fischetti; C., Cotto; F., Fracaro; Chiampo, Fulvia; Godio, Alberto; Ruggeri, Bernardo. - (2011). (Intervento presentato al convegno Thirteenth International Waste Management and Landfill Symposium tenutosi a S. Margherita di Pula, Cagliari, Italy nel Ottobre 2011).
FULL SCALE USE OF LIQUID INJECTION, FOR INNOVATIVE CONTROL OF WASTE MOISTURE TO ENHANCE BIOGAS PRODUCTION IN PRE TREATED WASTE LANDFILL (BIO.LEA.R.)
CHIAMPO, Fulvia;GODIO, Alberto;RUGGERI, Bernardo
2011
Abstract
The Bio.Lea.R project has been selected for grant in Life+ Programme-Environmental Policy and Governance – Call 2009. It aims to compare the performance of a landfill for less reactive, biologically treated waste, managed as bioreactor, to that of a conventionally managed one, with regard to both environmental (especially in terms of biogas production) and economical aspects. During project lifetime (about 4 years), the waste moisture will be controlled using innovative and monitored liquid injection in order to extract higher biogas flow rates in a shorter time than the conventionally managed one.Pubblicazioni consigliate
I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.
https://hdl.handle.net/11583/2588519
Attenzione
Attenzione! I dati visualizzati non sono stati sottoposti a validazione da parte dell'ateneo