The aim of this work is the operation analysis of a CHP system based on the combustion of wood biomass residues. A superheatedwater boiler, which is fired with biomass residuals from pruning activities, supplies heat to two Organic Rankine Cycle (ORC) units and to a small district heating system. Operation data of the two units have been analyzed over more than two years with an hourly timestep, in order to analyze the system performance with respect to design conditions. The results show a good availability of the biomass system, but the average gross power output of the two ORC units is lower than the nominal power. The main cause is related to the temperature of the water supplied to the evaporator of the ORC units, which is often lower than the required value: the poor quality of the biomass and the high moisture result in low combustion conditions. The results of this study point out the importance of considering real operation conditions during the design phase of the system: the variability of the input biomass can lead to offdesign conditions, with lower performance than expected.
Operational Analysis of a Small Size CHP Plant for Energy Production from Residual Wood Biomass / Noussan, Michel; CERINO ABDIN, Giulio; Poggio, Alberto; Roberta, Roberto. - ELETTRONICO. - (2014). (Intervento presentato al convegno 22nd European Biomass Conference and Exhibition tenutosi a Hamburg nel June 2014) [10.5071/22ndEUBCE2014-2BV.2.64].
Operational Analysis of a Small Size CHP Plant for Energy Production from Residual Wood Biomass
NOUSSAN, MICHEL;CERINO ABDIN, GIULIO;POGGIO, ALBERTO;
2014
Abstract
The aim of this work is the operation analysis of a CHP system based on the combustion of wood biomass residues. A superheatedwater boiler, which is fired with biomass residuals from pruning activities, supplies heat to two Organic Rankine Cycle (ORC) units and to a small district heating system. Operation data of the two units have been analyzed over more than two years with an hourly timestep, in order to analyze the system performance with respect to design conditions. The results show a good availability of the biomass system, but the average gross power output of the two ORC units is lower than the nominal power. The main cause is related to the temperature of the water supplied to the evaporator of the ORC units, which is often lower than the required value: the poor quality of the biomass and the high moisture result in low combustion conditions. The results of this study point out the importance of considering real operation conditions during the design phase of the system: the variability of the input biomass can lead to offdesign conditions, with lower performance than expected.Pubblicazioni consigliate
I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.
https://hdl.handle.net/11583/2557541
Attenzione
Attenzione! I dati visualizzati non sono stati sottoposti a validazione da parte dell'ateneo