The growing share of volatile renewable energy requires enhanced flexibility from demand-side resources. This study transforms traditionally rigid coal mines into active grid participants by developing a novel two-stage optimization framework for their high-power equipment. The framework integrates detailed mining process models with electricity market mechanisms, enabling mines to participate in price-based and grid-directed demand response (DR). An economic model minimizes total operational costs (electricity and labor) while satisfying all production and safety constraints. A case study evaluates two strategies: the single-speed optimization strategy and the coordinated speed–time optimization strategy. Results show that the coordinated strategy unlocks significant flexibility, reducing electricity costs by up to 44.63%, labor costs by 29.97%, and total costs by 31.81%. This work demonstrates the substantial grid flexibility potential of coal mines and provides a practical, holistic decision-making tool for their integration into smart grids as valuable, controllable loads.

Transforming coal mines into flexible loads: a two-stage optimization approach for enhancing grid flexibility through critical equipment scheduling / Chen, D., Zheng, Z., Huang, T.. - In: ELECTRICAL ENGINEERING. - ISSN 0948-7921. - 108:10(2026). [10.1007/s00202-026-03782-z]

Transforming coal mines into flexible loads: a two-stage optimization approach for enhancing grid flexibility through critical equipment scheduling

Huang T.
2026

Abstract

The growing share of volatile renewable energy requires enhanced flexibility from demand-side resources. This study transforms traditionally rigid coal mines into active grid participants by developing a novel two-stage optimization framework for their high-power equipment. The framework integrates detailed mining process models with electricity market mechanisms, enabling mines to participate in price-based and grid-directed demand response (DR). An economic model minimizes total operational costs (electricity and labor) while satisfying all production and safety constraints. A case study evaluates two strategies: the single-speed optimization strategy and the coordinated speed–time optimization strategy. Results show that the coordinated strategy unlocks significant flexibility, reducing electricity costs by up to 44.63%, labor costs by 29.97%, and total costs by 31.81%. This work demonstrates the substantial grid flexibility potential of coal mines and provides a practical, holistic decision-making tool for their integration into smart grids as valuable, controllable loads.
File in questo prodotto:
File Dimensione Formato  
Transforming coal mines in.pdf

accesso riservato

Descrizione: Published Record
Tipologia: 2a Post-print versione editoriale / Version of Record
Licenza: Non Pubblico - Accesso privato/ristretto
Dimensione 2.58 MB
Formato Adobe PDF
2.58 MB Adobe PDF   Visualizza/Apri   Richiedi una copia
main.pdf

embargo fino al 04/10/2027

Descrizione: AAM
Tipologia: 2. Post-print / Author's Accepted Manuscript
Licenza: Pubblico - Tutti i diritti riservati
Dimensione 4.71 MB
Formato Adobe PDF
4.71 MB Adobe PDF   Visualizza/Apri   Richiedi una copia
Pubblicazioni consigliate

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11583/3017543