One common problem among Small and Medium Enterprises (SME) is to don’t have at disposal formal and simple approaches for production scheduling, especially in case of an event that introduces the requirement of a re-planning. The paper approaches this kind of event-driven re-scheduling problems at the arrival of a new order, when some jobs are under processing, some operation have already finished and other jobs are waiting to be loaded on a machine. For a simple application in a SME, to the operations already started and completed for a job a processing time equal to zero is assigned; the operations already started but not yet completed are interrupted and considered as operations that must be executed for the remaining part of their processing time; all the other jobs are considered for the event-driven job-shop re-scheduling problem. A validation of the procedure in a realistic application is presented.
Event-driven production scheduling in SME / Villa, Agostino; Taurino, Teresa. - In: PRODUCTION PLANNING & CONTROL. - ISSN 0953-7287. - 29:4(2018), pp. 271-279. [10.1080/09537287.2017.1401143]
Event-driven production scheduling in SME
Villa, Agostino;Taurino, Teresa
2018
Abstract
One common problem among Small and Medium Enterprises (SME) is to don’t have at disposal formal and simple approaches for production scheduling, especially in case of an event that introduces the requirement of a re-planning. The paper approaches this kind of event-driven re-scheduling problems at the arrival of a new order, when some jobs are under processing, some operation have already finished and other jobs are waiting to be loaded on a machine. For a simple application in a SME, to the operations already started and completed for a job a processing time equal to zero is assigned; the operations already started but not yet completed are interrupted and considered as operations that must be executed for the remaining part of their processing time; all the other jobs are considered for the event-driven job-shop re-scheduling problem. A validation of the procedure in a realistic application is presented.File | Dimensione | Formato | |
---|---|---|---|
Event driven production scheduling in SME.pdf
non disponibili
Tipologia:
2a Post-print versione editoriale / Version of Record
Licenza:
Non Pubblico - Accesso privato/ristretto
Dimensione
1.25 MB
Formato
Adobe PDF
|
1.25 MB | Adobe PDF | Visualizza/Apri Richiedi una copia |
Pubblicazioni consigliate
I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.
https://hdl.handle.net/11583/2721552
Attenzione
Attenzione! I dati visualizzati non sono stati sottoposti a validazione da parte dell'ateneo