The presence of residual nitrogen loads in treated wastewater may cause eutrophication in receiving water bodies. Nitrogen removal in wastewater treatment plants (WWTPs) is commonly based on nitrification--denitrification (NdN). This study presents a novel and practical assessment tool which uses mass balances to evaluate the efficiencies of the NdN processes in WWTPs. The tool was tested on a WWTP with a capacity of 137 000 population equivalent (p.e.). A six-year (2008--2013) survey of the plant demonstrated that the NdN compartment was not able to guarantee the annual average of 80% for the total nitrogen (TN) removal. This figure is fixed by the local wastewater regulation. From the survey data, the values of the kinetic constants for the processes of BOD5 (Biochemical Oxygen Demand) oxidation, nitrification and denitrification were calculated. With these values the influence of the process parameters (i.e. recycle ratio of the aerated mixture, flow rate, biomass concentration) and plant parameters (volume of the nitrification and denitrification ponds) on the efficiency of TN removal was evaluated. The results of the sensitivity analysis revealed that an intervention on process or plant parameters was not sufficient to reach the requested target of TN removal. Consequently, the introduction of a post-denitrification module was suggested.

Development of a practical tool for the assessment of biological performances in wastewater treatment plants / Malinverni, Francesca; Genon, Giuseppe; Ruffino, Barbara. - In: CLEAN - SOIL, AIR, WATER. - ISSN 1863-0650. - STAMPA. - 44:11(2016), pp. 1435-1443. [10.1002/clen.201500568]

Development of a practical tool for the assessment of biological performances in wastewater treatment plants

GENON, Giuseppe;RUFFINO, BARBARA
2016

Abstract

The presence of residual nitrogen loads in treated wastewater may cause eutrophication in receiving water bodies. Nitrogen removal in wastewater treatment plants (WWTPs) is commonly based on nitrification--denitrification (NdN). This study presents a novel and practical assessment tool which uses mass balances to evaluate the efficiencies of the NdN processes in WWTPs. The tool was tested on a WWTP with a capacity of 137 000 population equivalent (p.e.). A six-year (2008--2013) survey of the plant demonstrated that the NdN compartment was not able to guarantee the annual average of 80% for the total nitrogen (TN) removal. This figure is fixed by the local wastewater regulation. From the survey data, the values of the kinetic constants for the processes of BOD5 (Biochemical Oxygen Demand) oxidation, nitrification and denitrification were calculated. With these values the influence of the process parameters (i.e. recycle ratio of the aerated mixture, flow rate, biomass concentration) and plant parameters (volume of the nitrification and denitrification ponds) on the efficiency of TN removal was evaluated. The results of the sensitivity analysis revealed that an intervention on process or plant parameters was not sufficient to reach the requested target of TN removal. Consequently, the introduction of a post-denitrification module was suggested.
File in questo prodotto:
Non ci sono file associati a questo prodotto.
Pubblicazioni consigliate

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11583/2669884
 Attenzione

Attenzione! I dati visualizzati non sono stati sottoposti a validazione da parte dell'ateneo