The paper describes a proposed approach for operationalizing the Common Operational Picture concept introduced in the EU FP 7 TOSCA (Total Operations Management for Safety Critical Activities) project, in order to jointly integrate and enhance safety, quality and productivity in the production environment. The approach combines different methods for the description and analysis of plant and operations, including Task Analysis, 4D process simulation, hazard analysis and Pareto optimization, and iterates through them to generate a final procedure. The proposed approach has been demonstrated on an industrial case study related to planning of infrequent cold water pressure testing of LPG storage tanks, and the process and results of this case study are presented and discussed. The plant management was provided with a detailed list of the main tasks (22), sub-tasks (115), the specific risks identified (26, considering procedural delays, occupational safety and process safety) and the specific recommendations (20) for safety and time optimization of the planned testing procedure. The approach was successfully demonstrated as a suitable vehicle for the analysis and planning of rare, complex, unconventional work tasks that are hard to visualize, where the establishment of a Common Operational Picture (COP) among all relevant personnel in the hazardous operations is a must.
Design of procedures for rare, new or complex processes: Part 1 - An iterative risk-based approach and case study / Marko, Gerbec; Nora, Balfe; Leva, MARIA CHIARA; Prast, Stephen; Demichela, Micaela. - In: SAFETY SCIENCE. - ISSN 0925-7535. - STAMPA. - 100:B(2017), pp. 195-202. [10.1016/j.ssci.2016.08.015]
Design of procedures for rare, new or complex processes: Part 1 - An iterative risk-based approach and case study
Leva Maria Chiara;Demichela Micaela
2017
Abstract
The paper describes a proposed approach for operationalizing the Common Operational Picture concept introduced in the EU FP 7 TOSCA (Total Operations Management for Safety Critical Activities) project, in order to jointly integrate and enhance safety, quality and productivity in the production environment. The approach combines different methods for the description and analysis of plant and operations, including Task Analysis, 4D process simulation, hazard analysis and Pareto optimization, and iterates through them to generate a final procedure. The proposed approach has been demonstrated on an industrial case study related to planning of infrequent cold water pressure testing of LPG storage tanks, and the process and results of this case study are presented and discussed. The plant management was provided with a detailed list of the main tasks (22), sub-tasks (115), the specific risks identified (26, considering procedural delays, occupational safety and process safety) and the specific recommendations (20) for safety and time optimization of the planned testing procedure. The approach was successfully demonstrated as a suitable vehicle for the analysis and planning of rare, complex, unconventional work tasks that are hard to visualize, where the establishment of a Common Operational Picture (COP) among all relevant personnel in the hazardous operations is a must.File | Dimensione | Formato | |
---|---|---|---|
1-s2.0-S0925753516301771-main.pdf
non disponibili
Tipologia:
2a Post-print versione editoriale / Version of Record
Licenza:
Non Pubblico - Accesso privato/ristretto
Dimensione
1.94 MB
Formato
Adobe PDF
|
1.94 MB | Adobe PDF | Visualizza/Apri Richiedi una copia |
Pubblicazioni consigliate
I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.
https://hdl.handle.net/11583/2666259
Attenzione
Attenzione! I dati visualizzati non sono stati sottoposti a validazione da parte dell'ateneo