In mechanized tunneling the annular gap between the segmental lining and the surrounding soil caused by tunnel driving, must be backfilled almost instantaneously with an adequate grouting mortar when tunnelling in soils and particularly in urban area at low overburden. The main goal of this research is to investigate the grouting performance of two-component grout mix also when long curing time is considered.
Long term behavior of two component back-fill grout mix used in full face mechanized tunneling / Peila, Daniele; Chieregato, Alessio; Martinelli, Daniele; ONATE SALAZAR, CRISTINA GABRIELA; Shah, Ravi; Boscaro, Alessandro; Dal Negro, E.; Picchio, Andrea. - In: GEAM. GEOINGEGNERIA AMBIENTALE E MINERARIA. - ISSN 1121-9041. - STAMPA. - 144:1(2015), pp. 57-63.
Long term behavior of two component back-fill grout mix used in full face mechanized tunneling
PEILA, Daniele;CHIEREGATO, ALESSIO;MARTINELLI, DANIELE;ONATE SALAZAR, CRISTINA GABRIELA;SHAH, RAVI;BOSCARO, Alessandro;PICCHIO, ANDREA
2015
Abstract
In mechanized tunneling the annular gap between the segmental lining and the surrounding soil caused by tunnel driving, must be backfilled almost instantaneously with an adequate grouting mortar when tunnelling in soils and particularly in urban area at low overburden. The main goal of this research is to investigate the grouting performance of two-component grout mix also when long curing time is considered.File | Dimensione | Formato | |
---|---|---|---|
2015-GEAM_144 -BICOMPONENTE.pdf
accesso aperto
Tipologia:
2a Post-print versione editoriale / Version of Record
Licenza:
PUBBLICO - Tutti i diritti riservati
Dimensione
1.4 MB
Formato
Adobe PDF
|
1.4 MB | Adobe PDF | Visualizza/Apri |
Pubblicazioni consigliate
I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.
https://hdl.handle.net/11583/2642311
Attenzione
Attenzione! I dati visualizzati non sono stati sottoposti a validazione da parte dell'ateneo