In mechanized tunneling the annular gap between the segmental lining and the surrounding soil caused by tunnel driving, must be backfilled almost instantaneously with an adequate grouting mortar when tunnelling in soils and particularly in urban area at low overburden. The main goal of this research is to investigate the grouting performance of two-component grout mix also when long curing time is considered.
Utilizza questo identificativo per citare o creare un link a questo documento:
http://hdl.handle.net/11583/2642311
Titolo: | Long term behavior of two component back-fill grout mix used in full face mechanized tunneling |
Autori: | |
Data di pubblicazione: | 2015 |
Rivista: | |
Abstract: | In mechanized tunneling the annular gap between the segmental lining and the surrounding soil caused by tunnel driving, must be backfilled almost instantaneously with an adequate grouting mortar when tunnelling in soils and particularly in urban area at low overburden. The main goal of this research is to investigate the grouting performance of two-component grout mix also when long curing time is considered. |
Appare nelle tipologie: | 1.1 Articolo in rivista |
File in questo prodotto:
File | Descrizione | Tipologia | Licenza | |
---|---|---|---|---|
2015-GEAM_144 -BICOMPONENTE.pdf | 2. Post-print | PUBBLICO - Tutti i diritti riservati | Visibile a tuttiVisualizza/Apri |
I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.