This paper studies a real-life multiple objective flowshop scheduling problem in a cardboard company which differs from the conventional flowshop scheduling problem in several aspects, such as multi-machine stations, sequence-dependent setup times, work calendars on resources, re-entrant flows, external operations, and transfer batches between stations. A simulation-based environment is presented in which the production sequence can be interactively chosen by the user or found by a tabu-search based heuristic algorithm while a discrete-event simulation deals with the timing aspect.
Workload simulation and optimisation in multi-criteria hybrid flowshop scheduling: a case study / Alfieri, Arianna. - In: INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH. - ISSN 0020-7543. - STAMPA. - 47:18(2009), pp. 5129-5145. [10.1080/00207540802010823]
Workload simulation and optimisation in multi-criteria hybrid flowshop scheduling: a case study.
ALFIERI, Arianna
2009
Abstract
This paper studies a real-life multiple objective flowshop scheduling problem in a cardboard company which differs from the conventional flowshop scheduling problem in several aspects, such as multi-machine stations, sequence-dependent setup times, work calendars on resources, re-entrant flows, external operations, and transfer batches between stations. A simulation-based environment is presented in which the production sequence can be interactively chosen by the user or found by a tabu-search based heuristic algorithm while a discrete-event simulation deals with the timing aspect.Pubblicazioni consigliate
I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.
https://hdl.handle.net/11583/1817466
Attenzione
Attenzione! I dati visualizzati non sono stati sottoposti a validazione da parte dell'ateneo