The aim of this study is to describe the first full scale application of a zerovalent iron permeable reactive barrier in Italy and illustrate the preliminary results of the monitoring plan. The PRB was designed and emplaced to remediate a chlorinated hydrocarbons plume at an old industrial landfill site, in Avigliana, near the city of Torino, in the Piemonte region. The installation of the 120 m long, 13 m deep and 0.6 m thick barrier was accomplshed using a clamshell for the excavation of the trench and a guar gum slurry to support the walls. After a description of the intervention, preliminary results of the monitoring plan are presented.
Construction and monitoring of a permeable reactive barrier near the city of Torino in Italy / DI MOLFETTA, Antonio; Sethi, Rajandrea; Zolla, Valerio. - In: ITALIAN JOURNAL OF ENGINEERING GEOLOGY AND ENVIRONMENT. - ISSN 1825-6635. - STAMPA. - (2007), pp. 39-43.
Construction and monitoring of a permeable reactive barrier near the city of Torino in Italy
DI MOLFETTA, Antonio;SETHI, RAJANDREA;ZOLLA, VALERIO
2007
Abstract
The aim of this study is to describe the first full scale application of a zerovalent iron permeable reactive barrier in Italy and illustrate the preliminary results of the monitoring plan. The PRB was designed and emplaced to remediate a chlorinated hydrocarbons plume at an old industrial landfill site, in Avigliana, near the city of Torino, in the Piemonte region. The installation of the 120 m long, 13 m deep and 0.6 m thick barrier was accomplshed using a clamshell for the excavation of the trench and a guar gum slurry to support the walls. After a description of the intervention, preliminary results of the monitoring plan are presented.Pubblicazioni consigliate
I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.
https://hdl.handle.net/11583/1656510
Attenzione
Attenzione! I dati visualizzati non sono stati sottoposti a validazione da parte dell'ateneo