ABSTRACT A correct waste containment philosophy consists of: (1) optimization of the landfill location, (2) construction of high performance lining and capping systems, (3) optimization of waste storage, (4) short and long term careful monitoring, and (5) a convenient re-use of the landfill area after closure. The geotechnical engineer has strong skills about all the aforementioned topics but in particular can effectively deal with the design, construction quality control and monitoring of the lining and cover systems, the waste storage and compaction procedure, and the foundation and improving treatments for constructions above waste deposits. Due to the large number of geotechnical aspects involved into the above listed issues, only the lining systems for landfill base and sides are illustrated in this chapter. These topics have been developed referring to their background, recent advancements and new trends. In particular, the fundamentals of updated design procedures are illustrated with particular reference to conceptual and practical modeling and assessment of related input parameters. Moreover the main literature references are provided.

Chapitre VII: Barrières de confinement des centres de stockage des déchets / Manassero, Mario; Bouazza, A. - In: Géomécanique environnementale: sols pollués et déchets / P. DELAGE; B. SCHREFLER. - STAMPA. - PARIGI : Lavoisier - Hermes, 2005. - ISBN 9782746211315. - pp. 195-246

Chapitre VII: Barrières de confinement des centres de stockage des déchets

MANASSERO, Mario;
2005

Abstract

ABSTRACT A correct waste containment philosophy consists of: (1) optimization of the landfill location, (2) construction of high performance lining and capping systems, (3) optimization of waste storage, (4) short and long term careful monitoring, and (5) a convenient re-use of the landfill area after closure. The geotechnical engineer has strong skills about all the aforementioned topics but in particular can effectively deal with the design, construction quality control and monitoring of the lining and cover systems, the waste storage and compaction procedure, and the foundation and improving treatments for constructions above waste deposits. Due to the large number of geotechnical aspects involved into the above listed issues, only the lining systems for landfill base and sides are illustrated in this chapter. These topics have been developed referring to their background, recent advancements and new trends. In particular, the fundamentals of updated design procedures are illustrated with particular reference to conceptual and practical modeling and assessment of related input parameters. Moreover the main literature references are provided.
2005
9782746211315
Géomécanique environnementale: sols pollués et déchets
File in questo prodotto:
Non ci sono file associati a questo prodotto.
Pubblicazioni consigliate

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11583/1395581
 Attenzione

Attenzione! I dati visualizzati non sono stati sottoposti a validazione da parte dell'ateneo