Sfoglia per Autore  NARBAEV, TIMUR

Opzioni
Mostrati risultati da 1 a 20 di 25
Citazione Data di pubblicazione Autori File
Cost Estimate at Completion Methods in Construction Projects / Narbaev, Timur; DE MARCO, Alberto. - STAMPA. - 15:(2011), pp. 32-36. (Intervento presentato al convegno 2nd International Conference on Construction and Project Management tenutosi a Singapore nel 16-18 September 2011). 1-gen-2011 NARBAEV, TIMURDE MARCO, Alberto -
Using Project Financing to Develop Constructed Facilities in Italy / DE MARCO, Alberto; Mangano, Giulio; Narbaev, Timur. - STAMPA. - 15:(2011), pp. 11-15. (Intervento presentato al convegno 2nd International Conference on Construction and Project Management tenutosi a Singapore nel September 16-18 2011). 1-gen-2011 DE MARCO, AlbertoMANGANO, GIULIONARBAEV, TIMUR -
Combination of a Nonlinear Regression Model and Earned Schedule to Forecast a Project Final Cost / Narbaev, Timur; DE MARCO, Alberto. - STAMPA. - (2012), pp. 22-25. (Intervento presentato al convegno The 4th European Conference on Integrated Projects Controls tenutosi a Twente (The Netherlands) nel 28-29 November 2012). 1-gen-2012 NARBAEV, TIMURDE MARCO, Alberto -
Forecasting cost at completion with growth models and Earned Value Management / Narbaev, Timur. - STAMPA. - (2012). 1-gen-2012 NARBAEV, TIMUR -
Risk-Adjusted Contingency Management in Construction Projects / Thaheem, MUHAMMAD JAMALUDDIN; DE MARCO, Alberto; Narbaev, Timur. - STAMPA. - (2013), pp. 191-195. (Intervento presentato al convegno International Conference on Safety, Construction Engineering, and Project Management tenutosi a Islamabad nel August 19-21, 2013). 1-gen-2013 THAHEEM, MUHAMMAD JAMALUDDINDE MARCO, AlbertoNARBAEV, TIMUR ICSCEPM2013 Proceedings_Paper 2.pdf
Earned Value-Based Performance Monitoring of Facility Construction Projects / DE MARCO, Alberto; Narbaev, Timur. - In: JOURNAL OF FACILITIES MANAGEMENT. - ISSN 1472-5967. - STAMPA. - 11:1(2013), pp. 69-80. [10.1108/14725961311301475] 1-gen-2013 DE MARCO, AlbertoNARBAEV, TIMUR Monitoring_Manuscript_R1.pdf
Combination of Growth Model and Earned Schedule to Forecast Project Cost at Completion / Narbaev, Timur; DE MARCO, Alberto. - In: JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT. - ISSN 0733-9364. - STAMPA. - 140:1(2014), p. Article number 04013038. [10.1061/(ASCE)CO.1943-7862.0000783] 1-gen-2014 NARBAEV, TIMURDE MARCO, Alberto (ASCE)CO.1943-7862.0000783_PrePrint.pdf
An earned schedule-based regression model to improve cost estimate at completion / Narbaev, Timur; DE MARCO, Alberto. - In: INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT. - ISSN 0263-7863. - STAMPA. - 32:6(2014), pp. 1007-1018. [10.1016/j.ijproman.2013.12.005] 1-gen-2014 NARBAEV, TIMURDE MARCO, Alberto TimurDeMarco_IJPM_PostPrint.pdf
Risk-Integrated Project Monitoring and Forecasting Framework for a PM Organization / Narbaev, Timur; DE MARCO, Alberto; Thaheem, MUHAMMAD JAMALUDDIN. - ELETTRONICO. - (2017). (Intervento presentato al convegno The 30th IPMA World Congress "Breakthrough competences for managing change" tenutosi a Astana, Kazakstan nel 5-7 September 2017). 1-gen-2017 Timur NarbaevAlberto De MarcoMuhammad Jamaluddin Thaheem -
Integrating risk in project cost forecasting / De Marco, A.; Narbaev, T.; Rafele, C.; Cagliano, A. C.. - In: ...SUMMER SCHOOL FRANCESCO TURCO. PROCEEDINGS. - ISSN 2283-8996. - STAMPA. - 2017:(2017), pp. 117-122. (Intervento presentato al convegno 22nd Summer School "Francesco Turco" - Industrial Systems Engineering 2017 tenutosi a Mondello Palace Hotel, Viale Principe di Scalea, ita nel 2017). 1-gen-2017 De Marco, A.Narbaev, T.Rafele, C.Cagliano, A. C. DeMarcoetal_AidiSS2017_CEACwCont_Manuscript_r1.pdf
The influence of risk on the equity share of build-operate-transfer projects / DE MARCO, Alberto; Mangano, Giulio; Narbaev, Timur. - In: BUILT ENVIRONMENT PROJECT AND ASSET MANAGEMENT. - ISSN 2044-124X. - 7:1(2017), pp. 45-58. [10.1108/BEPAM-02-2016-0003] 1-gen-2017 DE MARCO, AlbertoMANGANO, GIULIONARBAEV, TIMUR DeMarcoetalBepam2017.pdf
The impact of sustainability performance indicators on financial stability: evidence from the Russian oil and gas industry / Orazalin, N.; Mahmood, M.; Narbaev, T.. - In: ENVIRONMENTAL SCIENCE AND POLLUTION RESEARCH INTERNATIONAL. - ISSN 0944-1344. - 26:8(2019), pp. 8157-8168. [10.1007/s11356-019-04325-9] 1-gen-2019 Narbaev T. + s11356-019-04325-9.pdf
A multi-disciplinary meta-review of the public–private partnerships research / Narbaev, T.; De Marco, A.; Orazalin, N.. - In: CONSTRUCTION MANAGEMENT AND ECONOMICS. - ISSN 0144-6193. - STAMPA. - 38:2(2020), pp. 109-125. [10.1080/01446193.2019.1643033] 1-gen-2020 Narbaev T.De Marco A. + Narbaev et al_CME_2020_A multi disciplinary meta review of the PPP research_PostPrint.pdfA multi disciplinary meta review of the public private partnerships research.pdf
Research productivity in emerging economies: Empirical evidence from kazakhstan / Narbaev, T.; Amirbekova, D.. - In: PUBLICATIONS. - ISSN 2304-6775. - 9:4(2021). [10.3390/publications9040051] 1-gen-2021 Narbaev T. + publications-09-00051.pdf
Understanding Schedule Progress Using Earned Value and Earned Schedule Techniques at Path-Level / Capone, C.; Narbaev, T.. - 634:(2021), pp. 244-251. (Intervento presentato al convegno IFIP WG 5.7 International Conference on Advances in Production Management Systems, APMS 2021 tenutosi a fra nel 2021) [10.1007/978-3-030-85914-5_26]. 1-gen-2021 Narbaev T. + 520762_1_En_26_Chapter-2-11.pdf
Factors of schedule and cost performance of tunnel construction megaprojects / De Marco, A.; Narbaev, T.. - In: THE OPEN CIVIL ENGINEERING JOURNAL. - ISSN 1874-1495. - ELETTRONICO. - 15:1(2021), pp. 38-49. [10.2174/1874149502115010038] 1-gen-2021 De Marco A.Narbaev T. TOCIEJ-15-38.pdf
A META-ANALYSIS OF THE PUBLIC-PRIVATE PARTNERSHIP LITERATURE REVIEWS: EXPLORING THE IDENTITY OF THE FIELD / Narbaev, T.. - In: INTERNATIONAL JOURNAL OF STRATEGIC PROPERTY MANAGEMENT. - ISSN 1648-715X. - 26:4(2022), pp. 318-331. [10.3846/ijspm.2022.17860] 1-gen-2022 Narbaev T. 17860-Article Text-69317-2-10-20221107.pdf
The Research Environment in a Developing Economy: Reforms, Patterns, and Challenges in Kazakhstan / Amirbekova, D.; Narbaev, T.; Kussaiyn, M.. - In: PUBLICATIONS. - ISSN 2304-6775. - 10:4(2022). [10.3390/publications10040037] 1-gen-2022 Narbaev T. + publications-10-00037-v2.pdf
A Scientometric Analysis of Studies on Risk Management in Construction Projects / Osei-Kyei, R.; Narbaev, T.; Ampratwum, G.. - In: BUILDINGS. - ISSN 2075-5309. - 12:9(2022). [10.3390/buildings12091342] 1-gen-2022 Narbaev T. + buildings-12-01342.pdf
A Review of the Use of Game Theory in Project Management / Narbaev, T.; Hazlr, O.; Agi, M.. - In: JOURNAL OF MANAGEMENT IN ENGINEERING. - ISSN 0742-597X. - 38:6(2022). [10.1061/(ASCE)ME.1943-5479.0001092] 1-gen-2022 Narbaev T. + narbaev-et-al-2022-a-review-of-the-use-of-game-theory-in-project-management.pdf
Mostrati risultati da 1 a 20 di 25
Legenda icone

  •  file ad accesso aperto
  •  file disponibili sulla rete interna
  •  file disponibili agli utenti autorizzati
  •  file disponibili solo agli amministratori
  •  file sotto embargo
  •  nessun file disponibile